K-12 Case Studies
Featured Case: Aspen High School
The faculty at Aspen High School were experts at adaptation. They were always looking for the next technique, the next idea. But while their students improved, their equipment didn’t. Old, inefficient, boilers were breaking budgets, and holding them back.
Knowing it was time for a change, the decision was made to replace their aging boiler. They needed something that was both efficient and flexible, capable of handling fluctuating return temperatures, and maintaining affordability. When we told them what 5-pass design could do they knew that they had found what they were looking for. The order was placed.
Working with their engineers, we were with them every step of the way. From submittal, to installation, we were able to answer every question they had, and the process went off without a hitch. It wasn’t long before the boilers were ready for operation.
The school couldn’t be happier, and the results speak for themselves. The engineering firm in charge of the project named Unilux as their bent tube standard, and, when it was time to replace the boiler in Aspen Middle School, our name was at the top of the list. We were happy to help.